Northwest Energy Efficiency Council

Nonprofit trade association of the energy efficiency industry

  • News
    • Job Postings
    • Member Press Releases
  • Events
  • NEEC Programs
    • Smart Buildings Center
    • Tool Lending Library
    • Building Operator Certification (BOC)
    • Clean Buildings Performance Standard Helpdesk
    • K-12 Ventilation & Indoor Air Quality Helpdesk
  • Members
  • Resources
    • Building Tune-Ups Service Providers
    • Portland Benchmarking Providers
    • Seattle Benchmarking Providers
  • About
    • Staff
    • Contact
  • Membership
You are here: Home / Member Spotlight / Hotel Monaco: Energy-based Control Systems Optimization Project with ATS Automation

Hotel Monaco: Energy-based Control Systems Optimization Project with ATS Automation

September 27, 2013 By NEEC

The award-winning Hotel Monaco, located in downtown Seattle, tasked ATS with investigating, developing, and implementing energy-saving measures with a financial payback of five years or less. ATS not only reduced Hotel Monaco’s energy consumption while upgrading the Alerton Energy Management and Control System, but provided a financial payback of 2.4 years with a 41% return on investment for the project.

ATS was one of the few companies chosen to be a part of Seattle City Light’s control system retro-commissioning pilot program. This involves examining the control systems already installed in buildings and optimizing them to work as efficiently and economically as possible. Working with Seattle City Light, ATS was able to secure $46,117 in utility rebates and retro-commissioning incentives for Hotel Monaco.

ATS implemented over a dozen control-focused Energy Conservation Measures (ECMs) to optimize the Alerton system already in the 150,000 square foot building. This included upgrading the original IBEX system to the newer, enhanced Envision for BACtalk system which has become Alerton’s standard since the building was originally outfitted. Retro-commissioning energy conservation measures deployed included: Adding variable frequency drives, optimizing the chilled and hot water plants with new, load-based sequences of operations, repairing energy-wasting valves and actuators, and reducing equipment run times.

One year of data collected since implementation illustrates the following benefits:

  • 490,352 kilowatt hours saved
  • 17.6 point drop in Energy Usage Index
  • $46,117 in utility rebates received
  • $60,004 reduction in total energy spent

Final Project Results:

  • Final Project Cost: $192,967 
  • Final Utility Rebates: $46,117
  • Cost After Rebates:  $146,850
  • Energy Bill Reduction:  $60,004
  • Simple Payback:  2.4 years
  • Return on Investment:  41%

 

Filed Under: Member Spotlight

Subscribe to NEEC Updates via email

2022 Impact Snapshot

ECONorthwest Reports

Report cover

Two reports, commissioned by NEEC, provide quantitative results on the economic development effects of energy efficiency in WA and OR

View Reports

Events Calendar

Loading view.
  • There are no upcoming events.
  • March 2023

Calendar of Events

M Mon

T Tue

W Wed

T Thu

F Fri

S Sat

S Sun

0 events, 27

0 events, 28

0 events, 1

0 events, 2

0 events, 3

0 events, 4

0 events, 5

0 events, 6

0 events, 7

0 events, 8

0 events, 9

0 events, 10

0 events, 11

0 events, 12

0 events, 13

0 events, 14

0 events, 15

0 events, 16

0 events, 17

0 events, 18

0 events, 19

0 events, 20

0 events, 21

0 events, 22

0 events, 23

0 events, 24

0 events, 25

0 events, 26

0 events, 27

0 events, 28

0 events, 29

0 events, 30

0 events, 31

0 events, 1

0 events, 2

  • There are no upcoming events.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
  • There are no events on this day.
View Calendar

Recent News Posts

Job Posting (Oregon): Energy Engineer/Energy Coach

March 23, 2023

Job Posting (Oregon): Measure Development Manager, Deadline 3/31

March 23, 2023

Tier 2 Rulemaking Kick-Off Webinar April 13th 10:30AM – 12PM

March 23, 2023

Puget Sound Energy’s 2023 Accelerator program is open for business

March 17, 2023

CEM Training at the SBC, May 1st-5th

March 17, 2023

LinkedIn   Facebook

Northwest Energy Efficiency Council · Pacific Tower, 1200 12th Ave. S., Suite 110, Seattle, WA 98144 · info@neec.net · Contact Us

© 2023 · Northwest Energy Efficiency Council